Skip to main content

Infrastucture

Workshop Renovation Closure
Author Last Post

Today, Nicholas and I made a trench in the industrial arts shop floor to service the table saw and worktable, with power and dust collection. We also placed some self-levelling cement to even out the worst parts of the floor. Both of these will take over 24hrs to cure to a state that they can be safely walked on.

For this reason, the woodshop will be closed until Wednesday at 5pm. A sign will be posted on the door as well, we ask that the lights be left turned on to allow the heater fan inside to keep the temperature up for the best cement curing.

Return to Forum